HOME > Business Area > Experience List

    • 원자력발전설비기자재

      Year Customer Title Date
      2003 Kori N.P.P Manufacture of Monitoring equipmentforFuel Handling System 2003-03-30
      2004 KPS Kori Site Manufacture and Supply of installation materials for the dry transfer-equipment of Spent Fuel. 2004-10-10
      2009 Doosan Manufacture and Supply  of  Shippin Container  For Paloverde  N.P.P#1.2.3,USA 2009-06-30
      2010 Doosan Manufacture and Supply  of Surveillance capsule assembly for Shinkori# 1.2 &Shinwolseong#1.2 2010-10-15
      2011 KPS-enginering Material purchasing and production / supply for the Sealing element of the reactor water- tank 2011
      2011 Kori  N.P.P Manufacture and supply, Demonstration of S/G sludge cleaning equipment for Kori Nuclear Plant 2011
      2011 Doosan Manufacture and supply of  Surveillance capsule assembly for ShinKori #3.4 2011
      2011 Doosan Manufacture and Supply  of Fuel Rack special tool for Shinkori# 1.2 &Shinwolseong#1.2 2011-01-31
      2011 Doosan Manufacture and Supply Full Handling System (FTS,NFE&CEAE) for Shinkori#3.4 2011-12-28
      2012 Hyoseong Canning and finishing Processing for Suction, discharge Bent pipe, Pumping  tube, Pump bed of CWP Line for Kori #1 2012-09-27
      2013 Doosan Manufacture and Supply of  SGR Clamping Device and RCSMock-Upfor Hanul #3.4 2013
      2014 Doosan Manufacture and supply of  Fuel handling System (FTS,NFE,CEAE)  for BNPP#1,2,3,4 2014
      2014 Doosan Manufacture and supply of Fuel handling System (FTS,NFE,CEAE)  for Shin Hanul#1,2 2014
      2014 KPS-NTSC Manufacture and supply of End-Effector and Mock-up  forthe BFB replacement equipment ( including water-tank) 2014
      2014 KPS-NTSC Manufacture and supply of Under-water EDM Head &Suction Head for the Reactor BFB Group. 2014
      1
    • 원자력안정성

      Year Customer Title Date
      2001 KHNP- Kori Mantanence work for the LRS Concentrateed Liquid 2001-04-24
      2001 KHNP- Kori Manufacture  and supply of discharging Elbow and other 14 Items 2001-04-26
      2006 KPS NTSC Supply of  S/G Swirl Vane Partial Spare 100 EA and 2006-03-28
      2007 Doosan Manufacture and supply of  Inpact Limiter  on 2007-08-25
      2008 KPS NTSC Replacement services of S/G  Swirl Vane ,Kori #2.3 2008-06-07
      2009 Doosan Pressurize  heater  Replacement Services 2009-03-16
      2009 KHNP- Hanul Lifting Devices for Transfer Cask of Spent fuel 2009-07-20
      2010 Doosan Through nozzle maintenance of S/G  Primary  Head 2010-03-05
      2011 Doosan KHNP Maintenace services of WOLPressurizer Nozzle, Kori#2.3.4 2011-11-15
      2011 Doosan / KHNP Vent Pipe Maintenace of Nuclear Head, KSNP type 8 Unit 2011-12-28
      2012 KHNP Manufacture and supply  of Splices for conductor 2012-09-19
      2012 Doosan Performance improvements and  installation ,commissioning service for FHS , Hanul#5.6 2012-12-30
      2013 Doosan SG-B Channel Maintenane Services rendered , Hanbit#2 2013-03-15
      2013 Wolseong  N.P.P Creating a task of new Holes and Plugs to check  oil discharge on shielding Door, Wolseong#1.2 2013-11-08
      2014 Wolseong  N.P.P Creating a task of new Holes and Plugs to check  oil discharge on shielding Door, Wolseong#1.2 2014
      1
    • 100톤이상

      Year Customer Title Date
      2000 Doosan Maintenance of Turbine  Building Crane 2000-05-15
      2000 KHNP-KORI Replacement Main Hoist driver of Turbine Building Crane 2000-10-06
      2001 KHNP-KORI supporter  Replacement  of  Main conection Line  and cable s in Turbine  Building  Crane/ 2001-04-28
      2004 KPS-Kori Center Maintenance of Polar Crane Pandent –switch Box, KPS kori Center 2004-02-25
      2005 KHNP Replacement work for Track wheel Bearing  of 2005-03-20
      2007 Hyosung Polar crane Running rail  reformation ,Hanul#2 2007-05-30
      2007 KHNP-Hanul Replacement of Polar crane driving Collector-gear, Kori#1 2007-08-23
      2007 KHNP-Kori Polar crane Running rail  reformation , Hanul#1 2007-10-07
      2009 KHNP-Hanul Performance of RCB Polar Crane Total Maintenance 2009-04-26
      2011 KHNP-KORI Crane Maintenace of Turbine Buiding 235 ton-crane 2011-11-07
      2013 Doosan Installation work of Machinery and electrical Parts for 2013-03-22
      2013 Daelim Refurbishment Work of Hanul #1.2 Polar carane 2013-09-25
      1
    • 증기발생기

      Year Customer Title Date
      2011 Daelim OSG  Storage facility construction ( Old steam Generator  Keeping Storage Building )  2011-02-28
      2011 Daelim Manufacture and Supply ofSG Mock-Up , Hanul #1.2 2011-05-26
      2011 Areva-NP Manufacture and supply Of SGR-RCS Clamping Tools 2011-07-29
      2011 Areva-NP supply of Tools and Equipments for SGR Replace Project , Hanul#1.2 2011-07-30
      2011 Daelim Manufacture and supply  shim Plates for SGR supports and RCS-piping supports 2011-09-30
      2012 Areva-NP Local Manpower support to Areva-NP, Hanul#1.2 2012-04-18
      2012 Daelim Supply of Polar crane  Spare Parts, Hanul#1.2 2012-11-05
      2013 Sam-Jin Manufacture and installation of Main supporting  Iron frame for SGR Replacement, Hanul#1.2 2013-05-06
      2013 Doosan Manufacture of  SGR Clamping Device and RCS Mock-Up 2013-05-10
      2013 Daelim Old S/G Storage Building Facility services rendered 2013-08-31
      2013 Doosan Manufacture of of RSG Mocku- Up Assembly ,Hanul#3.4 2013-11-30
      2014 Oleum Manufacture and supply of SGR Mock-Up 2014-06-20
      1