원자력발전설비기자재
Year Customer Title Date 2003 Kori N.P.P Manufacture of Monitoring equipmentforFuel Handling System 2003-03-30 2004 KPS Kori Site Manufacture and Supply of installation materials for the dry transfer-equipment of Spent Fuel. 2004-10-10 2009 Doosan Manufacture and Supply of Shippin Container For Paloverde N.P.P#1.2.3,USA 2009-06-30 2010 Doosan Manufacture and Supply of Surveillance capsule assembly for Shinkori# 1.2 &Shinwolseong#1.2 2010-10-15 2011 KPS-enginering Material purchasing and production / supply for the Sealing element of the reactor water- tank 2011 2011 Kori N.P.P Manufacture and supply, Demonstration of S/G sludge cleaning equipment for Kori Nuclear Plant 2011 2011 Doosan Manufacture and supply of Surveillance capsule assembly for ShinKori #3.4 2011 2011 Doosan Manufacture and Supply of Fuel Rack special tool for Shinkori# 1.2 &Shinwolseong#1.2 2011-01-31 2011 Doosan Manufacture and Supply Full Handling System (FTS,NFE&CEAE) for Shinkori#3.4 2011-12-28 2012 Hyoseong Canning and finishing Processing for Suction, discharge Bent pipe, Pumping tube, Pump bed of CWP Line for Kori #1 2012-09-27 2013 Doosan Manufacture and Supply of SGR Clamping Device and RCSMock-Upfor Hanul #3.4 2013 2014 Doosan Manufacture and supply of Fuel handling System (FTS,NFE,CEAE) for BNPP#1,2,3,4 2014 2014 Doosan Manufacture and supply of Fuel handling System (FTS,NFE,CEAE) for Shin Hanul#1,2 2014 2014 KPS-NTSC Manufacture and supply of End-Effector and Mock-up forthe BFB replacement equipment ( including water-tank) 2014 2014 KPS-NTSC Manufacture and supply of Under-water EDM Head &Suction Head for the Reactor BFB Group. 2014 -
원자력안정성
Year Customer Title Date 2001 KHNP- Kori Mantanence work for the LRS Concentrateed Liquid 2001-04-24 2001 KHNP- Kori Manufacture and supply of discharging Elbow and other 14 Items 2001-04-26 2006 KPS NTSC Supply of S/G Swirl Vane Partial Spare 100 EA and 2006-03-28 2007 Doosan Manufacture and supply of Inpact Limiter on 2007-08-25 2008 KPS NTSC Replacement services of S/G Swirl Vane ,Kori #2.3 2008-06-07 2009 Doosan Pressurize heater Replacement Services 2009-03-16 2009 KHNP- Hanul Lifting Devices for Transfer Cask of Spent fuel 2009-07-20 2010 Doosan Through nozzle maintenance of S/G Primary Head 2010-03-05 2011 Doosan KHNP Maintenace services of WOLPressurizer Nozzle, Kori#2.3.4 2011-11-15 2011 Doosan / KHNP Vent Pipe Maintenace of Nuclear Head, KSNP type 8 Unit 2011-12-28 2012 KHNP Manufacture and supply of Splices for conductor 2012-09-19 2012 Doosan Performance improvements and installation ,commissioning service for FHS , Hanul#5.6 2012-12-30 2013 Doosan SG-B Channel Maintenane Services rendered , Hanbit#2 2013-03-15 2013 Wolseong N.P.P Creating a task of new Holes and Plugs to check oil discharge on shielding Door, Wolseong#1.2 2013-11-08 2014 Wolseong N.P.P Creating a task of new Holes and Plugs to check oil discharge on shielding Door, Wolseong#1.2 2014 -
100톤이상
Year Customer Title Date 2000 Doosan Maintenance of Turbine Building Crane 2000-05-15 2000 KHNP-KORI Replacement Main Hoist driver of Turbine Building Crane 2000-10-06 2001 KHNP-KORI supporter Replacement of Main conection Line and cable s in Turbine Building Crane/ 2001-04-28 2004 KPS-Kori Center Maintenance of Polar Crane Pandent –switch Box, KPS kori Center 2004-02-25 2005 KHNP Replacement work for Track wheel Bearing of 2005-03-20 2007 Hyosung Polar crane Running rail reformation ,Hanul#2 2007-05-30 2007 KHNP-Hanul Replacement of Polar crane driving Collector-gear, Kori#1 2007-08-23 2007 KHNP-Kori Polar crane Running rail reformation , Hanul#1 2007-10-07 2009 KHNP-Hanul Performance of RCB Polar Crane Total Maintenance 2009-04-26 2011 KHNP-KORI Crane Maintenace of Turbine Buiding 235 ton-crane 2011-11-07 2013 Doosan Installation work of Machinery and electrical Parts for 2013-03-22 2013 Daelim Refurbishment Work of Hanul #1.2 Polar carane 2013-09-25 -
증기발생기
Year Customer Title Date 2011 Daelim OSG Storage facility construction ( Old steam Generator Keeping Storage Building ) 2011-02-28 2011 Daelim Manufacture and Supply ofSG Mock-Up , Hanul #1.2 2011-05-26 2011 Areva-NP Manufacture and supply Of SGR-RCS Clamping Tools 2011-07-29 2011 Areva-NP supply of Tools and Equipments for SGR Replace Project , Hanul#1.2 2011-07-30 2011 Daelim Manufacture and supply shim Plates for SGR supports and RCS-piping supports 2011-09-30 2012 Areva-NP Local Manpower support to Areva-NP, Hanul#1.2 2012-04-18 2012 Daelim Supply of Polar crane Spare Parts, Hanul#1.2 2012-11-05 2013 Sam-Jin Manufacture and installation of Main supporting Iron frame for SGR Replacement, Hanul#1.2 2013-05-06 2013 Doosan Manufacture of SGR Clamping Device and RCS Mock-Up 2013-05-10 2013 Daelim Old S/G Storage Building Facility services rendered 2013-08-31 2013 Doosan Manufacture of of RSG Mocku- Up Assembly ,Hanul#3.4 2013-11-30 2014 Oleum Manufacture and supply of SGR Mock-Up 2014-06-20